tension the structure
Thread each of the cables through the holes in the base (detail 1) and the tips of the masts (detail 2). Ensure that the first two sections are firmly secured. Tension the cable by inserting the upper rods into the middle sections.
   
 
 
   
   
          back
HOME NEWS GALLERY ASSEMBLY PRINTING MANUFACTURE CONTACT  US